CERTIFICATION & COMPLIANCE GUIDE

Prepare the lift CE procedure

Resolve the lift boundary, choose the route and demonstrate the completed installation.

Request a Quote +90 (232) 364 49 03
01

Select and prepare the route

Identify the market, installer, permanent building use, speed, carrier and controls. Separate a completed lift from an Annex III safety component. Choose the applicable lift procedure, confirm body notification and assemble design, component and test evidence. For Türkiye identify the 2014/33/AB route. Maintenance and periodic examination are distinct national operating tasks.

02

Complete the installation evidence

Resolve shaft/interface differences and carry out required installation and final tests. Track body findings through actual corrections and evidence. After conformity is demonstrated through the selected procedure, the installer prepares the declaration and marking. Paying Kayra or booking an assessment is not that result. Kayra prepares and coordinates without promising body acceptance or an official completion date.

QUICK QUOTE FORM

Tell us what you need and our specialists will contact you.

Resolve the lift boundary, choose the route and demonstrate the completed installation.

QUICK QUOTE FORM

Tell us what you need and our specialists will contact you.

A telephone number is required. You may leave the email field blank.

Your information is used only to respond to this enquiry. Privacy notice

WhatsApp