
Machinery CE marking: scope and machine safety
Determine the machine boundary, applicable CE procedure and evidence for its intended use before EU market placement.
Define the machine being supplied
Start with the machine’s function, moving parts, energy source, users and installation. Identify whether the supply is complete machinery, an integrated assembly or partly completed machinery. A motor or controller’s conformity evidence does not establish the safety of the complete assembly.
A hypothetical conveyor joined to a packaging machine may create transfer-point crushing risks and linked stop functions. Define who supplies the resulting whole and assess those interfaces; two component declarations cannot simply be combined into a declaration for the line.
Choose the actual conformity procedure
For EU machinery placed on the market before 20 January 2027, use Directive 2006/42/EC and its actual exclusions. Article 12 distinguishes Annex IV machinery and whether harmonised standards cover all relevant requirements; a notified body is not compulsory for every machine.
From 20 January 2027, Regulation 2023/1230 uses Annex I Parts A and B and Article 25. Its Annex III safety requirements and Annex IV technical documentation must not be confused with the Directive’s Annex IV category list.
Close the evidence for the final configuration
Connect risk assessment to drawings, protective measures, control verification, relevant tests and instructions for the supplied model. Examine foreseeable misuse, cleaning, maintenance and residual risks. A generic electrical report leaves mechanical and integration risks unresolved.
Kayra’s agreed product work can organise scope review and the technical evidence plan. The manufacturer remains responsible for conformity, declaration and marking; a notified body decides only within a verified notification and selected procedure. This page does not establish Kayra notification.
Explore the subject
Use the guides to explore scope and practical questions in this field and find the detail relevant to your situation.
Related machinery guides
- How to complete machinery CE conformity before supply
- Who is responsible for machinery CE marking and assessment?
- Choosing machinery CE technical support and assessment bodies
- Machinery CE technical file: required documents and traceability
- Machinery CE costs and timescale: quote the actual work
- Checking machinery CE evidence: declaration, model and body status
- Machinery CE changes, certificate review and surveillance
- Machinery CE assessment: inspection and test sequence
- When machinery CE marking is required: scope and exclusions
- Machinery CE questions: incorporation, electrical tests and line safety
- Machinery Regulation 2023/1230: the 2027 transition and later AI changes
Tell us what you need and our specialists will contact you.
For “Machinery CE marking: scope and machine safety”, share the machine function, current model and design revision, intended use, planned EU placement date and available risk or test records. Agreed product preparation work does not replace the manufacturer’s declaration or a legally required notified-body procedure.