Read the report’s actual scope
Record model, sample identifier, circuit or component version, standard and applied methods. Read findings and attachments rather than relying only on the cover conclusion. Explain differences when using a report for another model.
Map objectives to proof
The file must enable conformity assessment using design/manufacturing descriptions, risk analysis, drawings, standards and solutions, calculations and test records as relevant. A report in a folder does not prove every objective. Track missing requirements, uncovered methods and sample/production differences as open work.
Declaration and production
The manufacturer issues the LVD EU declaration and maintains production conformity. A test report does not replace these duties. Update the file and review evidence after design changes. Kayra helps organise requirements and reports; that work is neither a new test report nor approval by a competent authority.
Official sources
Reviewed: 3 October 2026. Check the current rules and assessment route for the actual product.