Describe the file before comparing quotations
List product, standard, brand, variants, factories, drawings, existing reports and production-control evidence. Identify missing inputs and which reports actually match the proposed scope. A price based only on the product name can conceal necessary assessment work.
Example: the report covers one model at the old site, but production moved and new variants are proposed. Separate the accepted evidence from unresolved site and variant questions. Do not describe the application as complete until TSE’s relevant evidence requirements are clarified.
Separate preparation and official or external charges
Show consultancy preparation separately from TSE inspection/certification work, necessary tests and samples, production corrections and mark-use charges. The official mark-use fee enquiry does not show the total cost of the project.
If a report is unsuitable, further work may change the estimate. State who commissions it, what is included and what remains dependent on TSE’s acceptance. Neither a consultancy payment nor an ISO9001 certificate guarantees a product certificate or removes every product test.
Timing and changes follow the actual evidence
Plan file and sample readiness, examination, any findings and correction responses as separate stages. Check current portal authority and KEP/e-signature conditions. Preparation, examination and corrective work have different responsible parties; no universal fixed completion date follows from the city.
Before mark use, verify certificate status and exact product/site scope. Include later changes and the relevant official conditions in the work boundary. Kayra cannot guarantee TSE’s decision, its date or rights beyond the issued certificate.
Responsibility
Kayra supports the defined preparation work. TSE certification and the competent defence security authority’s decisions remain official functions; Kayra does not issue these certificates or promise a positive decision. The responsible applicant retains actual product, facility and implementation duties.
Official sources
Reviewed: 3 October 2026. Check the current rules and assessment route for the actual product.