Direct answer
Cost and timing depend on the chosen part, welding processes, material groups, sites and gaps in WPS/WPQR, personnel qualifications and inspection evidence. Request separate prices for consultancy, qualification testing, NDT or other inspection, assessment and follow-up. Schedule unresolved technical work before the audit; there is no single duration for every workshop.