Direct answer
Before follow-up, review changes in welding process, material, WPS/WPQR, coordination personnel, sites and subcontractors. Bring current qualification, equipment, traceability, inspection and corrective-action records. Confirm notification, surveillance and renewal requirements with the issuing body; a new site or activity should not be assumed covered by the existing certificate.