Information for a quotation
Provide model and variants, function, installation, intended users, drawings and control diagrams. Distinguish individual-machine work from line integration, and prototype readiness from series-production or installation dates.
Cost and schedule
Risk findings may require guards, control-system verification or new tests; organising a file cannot replace missing design work. Separate consulting, corrections, testing and any required notified-body assessment. Define milestones by completed evidence. A laboratory delivery or file handover is not completion of all market-placement duties.
Market date and responsibility
For the EU/EEA route, machinery placed on the EU market before 20 January 2027 must comply with Directive 2006/42/EC; Regulation 2023/1230 applies mandatorily from that date. Check the actual product and transition rules. Kayra supports preparation and coordination, without assuming manufacturer responsibility or claiming notified-body status. No positive assessment or fixed marking date is guaranteed.
Official sources
Reviewed: 3 October 2026. Check the current rules and assessment route for the actual product.