Lift CE records: connect design to the installed lift
Prepare the selected procedure’s technical evidence for the actual installation.
Technical evidence for the selected route
Identify installer, lift serial identity, site, speed, load, travel and conformity procedure. Connect drawings, calculations, safety circuits, component documents and tests to the real installation. Annex VIII unit verification requires its stated technical documentation, including component type certificates and instructions; other permitted routes have their own requirements. A general ISO certificate is not this lift’s technical file.
Record the actual condition
If drawings show a different pit or clearance, document the discrepancy and completed corrective work. Do not invent a final test or replace a component report’s model number. Kayra can organise evidence and responses; the installer implements the work and signs its declaration after the applicable procedure. The notified body retains its assessment tasks, and operating inspection records remain separate.
Related service guides
- Lift CE conformity: assess the installed lift
- Lift CE cost and timing: price the actual work
- Verify lift CE documents and installation coverage
- Lift CE after changes: approval, surveillance and operation
- Lift assessment: verify the actual installation
- When does the Lifts Directive apply?
- Lift CE questions: components, tests and inspections
- Lift CE versus maintenance and periodic inspection
- Prepare the lift CE procedure
- Who decides lift CE conformity?
Tell us what you need and our specialists will contact you.
Prepare the selected procedure’s technical evidence for the actual installation.